• Relocation of the following: o (1) FPB • Provision & installation of the following: o (5) FPB’s o (4) VAV’s o (1) Chilled water FCU ? Pump package ? Coil kit o Hangers and supports as specified o Ductwork with insulation o Return air transfers o Grilles, registers, and diffusers with flex duct o Chilled water piping o Condensate drain piping o Vibration isolation as specified o Mechanical identification